SA Water – Happy Valley Reservoir Operations Entry

AMA Security provided an entrance control solution to ensure only authorised vehicles were able to gain access to the site with crucially no tailgating possible. 

This project consisted of a mix of civil works, electrical and fibre installed from the administration building coupled with licence plate recognition, CCTV, 4G intercoms, boom gates and tyre shredding spikes.

AMA needed to co-ordinate a number of sub-contract trades to ensure all of the works were completed in order and correctly. From Vacuum boring, excavations, vehicle armour rail installation and trenching for the underground services, including reinstating bitumen – the project was quite complex to co-ordinate.

We provided a pneumatic tyre shredding solution with boom gates and stop lights ensuring that no tailgating would occur. This technology, coupled with licence plate recognition software was leading edge at the time of installation. AMA was able to design and construct a solution that met the needs of a critical infrastructure client as well as bringing the project in on time and on budget.

1A
1
2
3
4
5
6
previous arrowprevious arrow
next arrownext arrow
1A
1
2
3
4
5
6
previous arrow
next arrow

Contact Us

76 Unley Road, Unley S.A. 5061
PO Box 589, Unley S.A 5061

Monday-Friday: 8am – 5pm

We are a proudly South Australian company.

We have the network and capability allowing us to service our clients throughout Australia.